Op Session #2

After 4 months, a job change, and college graduation for daughter #1, I was able to free up a Saturday  (31 May) to host Op Session #2 for the model S&NY.

I approached #2 with a great deal more trepidation than #1, paradoxically because #1 was deemed  a major success by the participants. So, the bar had been set, and standards must be now be upheld!

Crap.

Adding to the mystery, only 4 of the original 6 crewmembers were going to be able to make it. This turned out to be a good thing, as I was curious how a smaller crew would work out. (Pretty well, in fact.)

Despite the intervening 4 months, I was only able to make a few changes/improvements to the railroad: I got about 20 more cars weathered and on the layout, and I replaced 10 of the original CV turnout frogs with metal frogs from Proto:87 Stores. I also developed a tentative timetable schedule of trains.

The extra cars made a big difference, as there were now sufficient through cars to allow the “Fast Freight” (as the real S&NY called it) to make a third trip if necessary. Also, there were now enough through PRR hoppers from Marsh Hill to Towanda to necessitate the coal extra to do more sorting of cars in Marsh Hill yard. In addition, I changed the train instructions so that all the local switching at Newberry is done by the Fast Freight crew, rather than the Mixed train crew. This balanced the workload a bit more, and I think made all three jobs a bit more interesting and time-consuming in a good way. My goal is to have the crews busy enough to keep interest and focus up, but not too much to feel harried. After all, the S&NY was a struggling Depression-era shortline, not the PRR mainline.

The timetable was developed with input from the crews during Op Session #1; I had the fellows try to keep note of the times when they arrived and departed each station and how long the work took. Here is the trial version for Op Session #2:

SNY Timetable001

The timetable worked well for the first third of the session, but after that departed from reality too far to be of much use. After the first trains got to their destinations, the station work took FAR longer than I had allowed in the timetable, and the schedule fell apart. Adjustments will be made for the next session.

Since we did now have a timetable of sorts, I was able to act as “roving dispatcher” for a while, and wrote the very first orders for the railroad:

Op Session 2-4I have been studying this book, which is essential for learning timetable and train order operations for a model railroad:

19 East, Copy 3

I still have a lot to learn, as the “form” on the model orders is not quite correct. When referring to trains by number, the order should read, “NO 4 ENG 113 MEET NO 21 ENG 2784 AT MASTEN” We didn’t write any clearances in the interest of time, but I think eventually we will include those to add authenticity. The model forms are available from Micro Mark, and are really a bit too small, but will work ok for now.

Here is a real order and clearance card from the S&NY from 72 years ago:

Op Session 2-6

Op Session 2-5

 

There were still a few electrical glitches – the Bachmann 2-8-0’s had intermittent pick-up troubles, hopefully a wheel cleaning will fix that. I had remotored and painted a PFM Ma&Pa engine, which shorted intermittently between the cab and tender deck in tight curves. I have a fix planned for that problem which should not be difficult. The original CV turnout frogs continue to short intermittently at the closure rails, and I now plan to replace ALL the frogs with metal frogs from Proto:87. This will take a bit of time, but will eliminate that problem all together.

Despite that, I think Session #2 was a success, and I think the crews will agree. Interestingly, some of the fellows prefer one-man crews, and a couple think 2-man crews is the way to go. I think though for the time-being anyway, I will not INCREASE the number of people invited to a session.

Lastly a couple of photos from the session:

Photo by John Webster

Photo by John Webster

Fred L. works the NYC/RDG interchange at Newberry with Train 21.

 

Photo by John Webster

Photo by John Webster

Eastbound Mixed Train 4 works upgrade around the Masten Loop, crossing over Pleasant Stream.

4 Thoughts on “Op Session #2

  1. Ernest Colwell on June 23, 2014 at 15:09 said:

    Looks like you are perfecting those op sessions and enjoying the process. When you use clearance forms how will they work? The TT I have indicates they are needed before departure from Upper L.V. RR Station and Marsh Hill for all trains and Monroeton for train 525 (what ever that was-LV gas electric?). Apparently the clearance card was form 15. I was surprised that meets at Marsh Hill were specified to occur only on the north wye track, and I think that was the westernmost track on the mainline north (the next track being Northern Central (PRR) then A1,2,3,4,A blank and A5 being the short spur on the eastern side. So the yard body tracks were not used for meets. This is a rule I may have to modify as the north wye track is the shortest body track on my rendition of Marsh Hill. Also it appears there was an ash pit on the north wye track. I have had to move this closer to the coaling station complex otherwise it looks funny sitting off by itself, but am not sure about this yet since I don’t know exactly where the ash pit was, decisions, decisions. Congratulations on your daughters success, it’s good to get them successfully launched.,

    • exnavydoc@hotmail.com on June 24, 2014 at 22:25 said:

      Ernie,
      Thanks. I think we will need registers only at Newberry, Marsh Hill, and Towanda. I’m still trying to figure out how and when clearances are issued. The OpSig book “19 East, Copy 3” is very good; still trying to digest it, but it’s not real “clear” on clearances. The whole thing is a work in progress, but the fellows are having fun, so that is what counts.

      • Ernest Colwell on June 25, 2014 at 12:56 said:

        You are right about what counts. I expect to get the op sig book as a reference, just haven’t gotten to it yet. Clearances have been discussed in the mags, do you have Koester’s Realistic Model Railroad Operation? It’s discussed in there also.
        Have fun
        Ernie C

  2. Chris C on April 10, 2015 at 09:29 said:

    Clearances are required for a train to pass or leave a station with a train order signal set to other than proceed. Additionally, clearances are required at the originating station on any subdivision. So your train needs a clearance to depart its initial station, anytime it gets orders enroute, and at any station where it changes subdivisions. Ref Consolidated Code of Operating Rules, 1980 ed, Rules 83(b) and 220.

Leave a Reply to Ernest Colwell Cancel reply

Your email address will not be published. Required fields are marked *

Post Navigation